RPE_5118The mapping of the site was started.  Continuing the 2012 photogrammetry work carried on by Pierre Drap, we have placed two lines marked every meter along the site and started tagging the exposed concretions and timbers exposed.  The site seems to have lost between 10 and 15 cm of sediment through natural processes, and some of the features that were not apparent last year are now exposed. Work at the museum continued.