Sunday, June 16

Today we removed the geotextile from the previous year and assessed the preservation of the timbers exposed. We also assessed the state of the tags and the general condition of the area left from the excavation in 2012. The datum points from 2012 were remeasured and plotted on our maps.

This entry was posted in Gnalić 2013. Bookmark the permalink.